I-821 Final-Stage Waits Rise to 74 Days But Remain Far Below Last Year's 203
The week of Sep 7 brings a genuine two-sided read: a summer climb from near-zero medians to 74 days, alongside a 63.8% improvement from the same week in 2025.
I-821 Temporary Protected Status final-stage waits reached 74 days this week, up from 66 days last week and from readings of 2 to 4 days as recently as late June. The 8-week slope of +9.8 days per week signals a real acceleration. Yet the same 74-day figure sits 63.8% below the 203-day median recorded in the same week of 2025, and the 12-week trailing average of 46 days reflects how compressed this summer's early readings were. Both signals are real and neither cancels the other out.
- The I-821 final-stage wait reached 74 days this week, up +7 days (+10.9%) from last week's 66 days and up more than 70 days from the 2-to-4-day readings of late June.
- Despite the summer climb, this week's 74-day median is 63.8% below the 203-day reading from the same week in 2025 (n = 312).
- The dominant processing stage holds nearly 50,000 cases at a median of 419 days (Stage durations, 30-day window), accounting for roughly 60% of the observable pending caseload.
- The April through June 2026 filing-month cohorts show 9 to 10% approved at ages 15 to 23 weeks, while the overall active I-821 backlog of pending cases declined by about 1,770 cases (1.5%) over the most recent 28-day window.
- The 4-week forecast carries a residual standard deviation of 31 days and a band that runs from approximately 21 to 175 days across the outlook window, making any single midpoint an unreliable target.
A summer surge, but still well below last year
This week's 74-day median for Form I-821, Application for Temporary Protected Status, holds two distinct signals at once. The near-term picture shows acceleration: the 8-week slope is +9.8 days per week, and the reading has climbed more than 70 days since the single-digit lows of late June. The year-over-year picture is the opposite: 74 days compares to 203 days in the same week of 2025, a reduction of 63.8%. The 12-week trailing average of 46 days reflects just how compressed this summer's early readings were before the shift began.
The shape of the summer is visible in the 12-week trend table. Medians sat at 2 to 4 days from late June through late July, then shifted into the 50-to-97-day range beginning around the week of Aug 3. This week's 74 days follows last week's 66, a week-over-week rise of +7 days (+10.9%). What drove that shift is not clear from the data alone; the timing may reflect a change in which cases were reaching final adjudication (the case decision step where approval, denial, or an information request is issued) during those weeks, though the data does not let us confirm a mechanism.
Where cases are waiting right now
The stage duration table reflects the broader pending population observed over the last 30 days, not just this week's approvals. The dominant stage is 'USCIS Is Currently Processing the Case,' where the median wait is 419 days, with the 25th percentile (p25) at 367 days and the 75th percentile (p75) at 472 days, across 50,228 cases representing roughly 60% of the observable caseload. An additional 20,138 cases sit at 'Case Was Received and A Receipt Notice Was Sent,' with a median of 296 days. Together those two stages account for about 84% of the pending queue. For applicants currently in the pipeline, the typical wait is measured in months, not the weeks that recent approvals suggest.
The stage data also shows 975 cases at 'TPS Country Designation Terminated By FRN,' with a median of 104 days in current status (p25 of 63 days, p75 of 165 days, across those 975 cases), plus 28 additional cases under an alternate spelling of the same termination status. A termination status indicates that the applicant's country designation has ended; the data does not tell us which countries are affected or whether any legal reinstatement proceedings are underway.
Recent filers: slow clearance through mid-2026 cohorts
cohort (a group of cases) burndown measures what share of all cases filed in a given month has been approved as of this week's snapshot. Among the filing-month cohorts (cases grouped by the calendar month in which they were filed) tracked this week, the April 2026 group shows 9.6% approved at age 23 weeks, the June 2026 group shows 9.4% at age 15 weeks, and the May 2026 group shows 7.5% at age 19 weeks. The July through September 2026 cohorts show 0 to 1.6% approved, but those are immature groups at ages 1 to 10 weeks; low approval shares at those ages are expected, not a signal of worsening performance.
No prior-year cohort data at the same ages is available in this week's brief, so a same-age comparison is not possible. Separately, the overall active backlog of pending I-821 cases across all filing cohorts (a much larger population than the six cohorts in the burndown table) declined by about 1,770 cases, or 1.5%, over the 28-day window from Aug 17 to Sep 14, 2026, reaching approximately 119,329 active cases. That reduction is modest, but it indicates the pending queue is not expanding at present. The largest decline among maturing cohorts in the burndown table was the May 2026 group, which shed 9 active cases over the same period.
Preview
Unlock the full analysis for your case
See the complete outlook, a personalised lookup against this week's cohort, and your estimated approval window.
- Full premium analysis: outlook, what it means for you, and implications.
- Personalised case lookup against this week's cohort, with percentile and remaining days.
- Estimated approval window mapped to your filing date.
Cancel anytime. Plans from $5.99/month.