Approval Trends Brief
Issue 36Published Aug 31, 2026
Temporary Protected Status · Week 36
I-821

I-821 Approvals Run 66% Faster Than Last Year as Termination Wave Closes Tens of Thousands of Cases

This week's 66-day final-stage median sits 130 days below the same week in 2025. At the same time, more than 37,000 IOE transitions in the last 30 days carried a dominant status of "terminated," reflecting TPS country-designation terminations that are closing cases through a mechanism separate from adjudication speed.

Waiting on your own I-821 case?Track it free

The I-821 final-stage median reached 66 days the week of August 31, compared with 196 days in the same week of 2025, a 130-day, 66.2% gap. Last week's median was 90 days, so this week added a further 24-day improvement. Those approval numbers, however, sit alongside a separate and large movement: over the past 30 days, 37,023 IOE transitions carried the dominant status "TPS Country Designation Terminated By FRN," closing cases through a country-designation termination rather than an adjudication (USCIS's decision step) decision. Both signals are present this week, and they describe different populations moving toward resolution in different ways.

Key findings
  1. The I-821 final-stage median fell to 66 days the week of Aug 31, down 130 days (66.2%) from 196 days in the same week of 2025.
  2. Week-to-week medians have ranged from 2 days to 97 days over the last 12 weeks, a spread that reflects the varying composition of who is approved each week rather than a stable throughput rate.
  3. 37,023 IOE09 transitions in the last 30 days carried the dominant status 'terminated,' reflecting TPS country-designation terminations that close cases outside the standard approval pathway.
  4. Filing-month groups from April through June 2026 show clearance rates of 7.5% to 9.4% at ages 14 to 22 weeks, consistent with normal early-stage pacing for I-821.
  5. The 4-week forecast carries an R² of 0.37, too weak for a single-number projection; the week of Sep 28 projects at approximately ~39 to 167 days if the current slope continues.
01 / I-821 · Week 36, 2026

A year ago, TPS applicants waited three times as long

66days
The final-stage median for I-821 approvals this week, down 24 days from last week's 90-day reading and 130 days below the same-week figure in 2025.Same week last year: 196 days (n=303). WoW: -24 days.

This week's median of 66 days compares with 196 days in the same week of 2025 across 303 approved cases, a 66.2% gap. Last week's reading was 90 days, so this week marks a further 24-day improvement. For applicants tracking their own cases, a 66-day final-stage wait means that among cases approved this week, half resolved within roughly two months of their last reported status update. That figure does not describe every pending case; it reflects the composition of cases that happened to clear this particular week, which can vary as the queue's mix shifts.

Figure 1
The 12-week median trend shows wide week-to-week swings alongside a last-year overlay that illustrates the scale of the year-over-year improvement in final-stage wait times.
Median days from last reported status to approval, with the p25 to p75 band.
60060050050040040030030020020010010000DaysJun 15Jun 15Jun 22Jun 22Jun 29Jun 29Jul 6Jul 6Jul 13Jul 13Jul 20Jul 20Jul 27Jul 27Aug 3Aug 3Aug 10Aug 10Aug 17Aug 17Aug 24Aug 24Aug 31Aug 31Forecast
p25 to p75
Weekly median
Forecast
Last year
Source: MyCasesHub case-status updates. 2026-06-15 to 2026-08-31. n = 266 (this week).
02

The week-to-week swings are too large to ignore

The 12-week series runs from a low of 2 days in late June to a high of 97 days in mid-August, with this week landing at 66 days. The spread between the 25th percentile (p25) and the 75th percentile (p75) has been similarly wide in some weeks: the week of August 3 showed a p75 of 524 days against a median of 95, while this week's p75 is 127 days against a median of 66. That volatility is itself informative. The I-821 queue contains cases at very different stages of their processing life, and a given week's median reflects whoever happened to reach approval that week, not a steady or predictable throughput rate. The 8-week slope of +9.2 days per week and an R² of 0.37 together indicate that a rising trend is present but explains only about a third of the week-to-week variation.

03

Terminations, not approvals, are closing most cases right now

Alongside the weekly approval numbers sits a separate and much larger movement. Over the last 30 days, 37,023 IOE09 transitions carried the dominant status 'TPS Country Designation Terminated By FRN.' When the Department of Homeland Security ends a country's Temporary Protected Status designation through a Federal Register Notice, affected cases move to terminated status rather than approved or denied. This is a distinct pathway from the adjudication (the USCIS case decision step where approval, denial, or a Request for Evidence is issued) that produces the weekly median. The total active I-821 pending backlog of cases across all filing cohorts fell by 1,860, or 1.5%, over the 28 days from August 10 to September 7; the data brief notes that termination activity and standard approvals are both present in that period, though it does not assign the 1,860-case decline to either cause specifically.

Figure 2
The stage breakdown shows where active I-821 cases currently sit, including a 'TPS Country Designation Terminated By FRN' category that reflects the termination pipeline alongside standard processing and RFE response stages.
Median days at each last_status stage, 30-day window, raw case-level percentiles.
Last status before approval
Cases
Distribution (days)
Median
processing
1,878
p25 1 · p75 199
10 d
received
141
p25 516 · p75 566
546 d
Source: MyCasesHub case-status updates. 2026-08-07 to 2026-09-07. n varies by stage.
For subscribers

Preview

Unlock the full analysis for your case

See the complete outlook, a personalised lookup against this week's cohort, and your estimated approval window.

  • Full premium analysis: outlook, what it means for you, and implications.
  • Personalised case lookup against this week's cohort, with percentile and remaining days.
  • Estimated approval window mapped to your filing date.
See plans from $5.99/mo

Cancel anytime. Plans from $5.99/month.

About this brief

Approval Trends Brief is a weekly data report from the MyCasesHub Data Team. It uses live USCIS case status updates from millions of cases tracked through MyCasesHub. Briefs are issued every Monday and revised whenever a material trend change is detected.

Methodology and resources

  • Source: USCIS case status updates collected through MyCasesHub user activity.
  • Approval marker: first occurrence of approval, card produced, or oath ceremony status.
  • Days to approval: time from a case's last non-approval status update to that marker.
  • Outlier rule: cases with a measured wait above 1,095 days are excluded.
  • Sample size threshold: cohorts with fewer than 100 cases are flagged as low confidence.
  • How we compute these numbers·I-821 only