I-539 Final-Stage Wait Hits 12-Week High as Outlier Flag Fires at z=2.29

The week of September 7 brought a 128-day median, up 7 days from last week and the highest reading in the 12-week window. SRC's steep, confirmed upward slope makes this more than a one-week fluctuation to dismiss.

Waiting on your own I-539 case?Track it free

The I-539 final-stage wait reached 128 days the week of September 7, a 7-day jump from last week's 121-day reading and the peak of the past 12 weeks (which ranged from 94 to 128 days). A statistical outlier flag fired at z=2.29, placing this week's median more than two standard deviations above the 8-week trend line. Year over year, the gap is modest: the same week in 2025 came in at 125 days (across 442 cases). But SRC, which handled 72% of this week's approvals, carries an upward slope of +7.0 days per week with R²=0.91, the strongest confirmed trend among any center this week. The aggregate number and the center-level trend point in the same direction.

Key findings
  1. The I-539 final-stage median reached 128 days the week of September 7, the highest in the 12-week window (range: 94 to 128 days), triggering an outlier flag at z=2.29 against the 8-week trend line.
  2. SRC handled 2,751 of 3,820 approved cases (72%) this week and carries the only confirmed upward slope among centers: +7.0 days per week at R²=0.91.
  3. Cases that responded to an RFE (Request for Evidence) cleared in a median of 19 days, compared with 117 days for cases without an RFE, a 6x speed ratio consistent with a batch of responses adjudicated promptly.
  4. The April 2026 filing-month group is 37.4% approved at 23 weeks old; the overall active pending backlog grew +1.7% (to 187,050 cases) over the past 28 days, suggesting intake is outpacing clearance.
  5. The 4-week forecast carries a wide confidence band, reaching ~114 to 160 days by the week of October 5, reflecting the weak R²=0.20 fit on the 8-week regression.
01 / I-539 · Week 37

128 days: the week's high-water mark

128days
The final-stage wait for I-539 approvals reached 128 days the week of September 7, the highest single-week reading in the past 12 weeks.+7 days from last week (121 days); +3 days vs. same week last year (125 days, n=442).

The week of September 7, the median final-stage wait for I-539 cases (Application to Extend or Change Nonimmigrant Status) reached 128 days, up 7 days from last week's 121-day reading. That puts this week at the top of the 12-week range, which has run from 94 to 128 days. The outlier_week_high flag fired at z=2.29 against the prior 8-week trend line, meaning this week's reading sits more than two standard deviations above where the recent trajectory would predict. The 12-week trailing average is 113 days, so the current reading is 15 days above that baseline. The year-over-year gap is smaller: the same week in 2025 posted 125 days, a difference of just 3 days (+2.2%). With an 8-week regression R² of only 0.20, the underlying trend is noisy, and one outlier week does not confirm a direction change on its own.

Figure 1
The 12-week median trend shows a broadly variable series bottoming at 94 days in early August before climbing to this week's 128-day peak, with the outlier flag visible at W37.
Median days from last reported status to approval, with the p25 to p75 band.
2002001501501001005050DaysJun 22Jun 22Jun 29Jun 29Jul 6Jul 6Jul 13Jul 13Jul 20Jul 20Jul 27Jul 27Aug 3Aug 3Aug 10Aug 10Aug 17Aug 17Aug 24Aug 24Aug 31Aug 31Sep 7Sep 7Forecast
p25 to p75
Weekly median
Forecast
Last year
Source: MyCasesHub case-status updates. 2026-06-22 to 2026-09-07. n = 3,820 (W37).

One piece of context the timing aligns with: USCIS announced in August that older editions of Form I-539 will be rejected starting September 15, 2026 (news-001). A short-run filing increase ahead of that deadline could have added recently receipted cases to the pipeline, which may reflect in processing volumes in coming weeks. The data cannot confirm that mechanism, and a single week is not enough to distinguish a one-time intake effect from the beginning of a broader slowdown.

02 / I-539 · Service centers

SRC's slope is the one to watch

SRC · Texas
80days median
p25/p75 not shown · n = 2,751 · transferred share 46%
WAC · California
251days median
p25/p75 not shown · n = 504 · transferred share 0%

SRC (the Texas Service Center) handled 2,751 of this week's 3,820 approved cases, or 72% of total volume. Its median sits at 80 days, and it carries a slope of +7.0 days per week with an R² of 0.91, the only center this week with both a steep upward slope and a statistically strong fit. Because 46% of SRC's approvals were transfer-touched (cases originally filed elsewhere and routed to SRC before adjudication (USCIS's decision step)), the population SRC is clearing may differ meaningfully from the population of cases originally filed there; these groups are not directly comparable. WAC (the California Service Center, code WAC) processed 504 cases this week, none transfer-touched, and runs at a median of 251 days with a declining slope of -3.3 days per week. Center medians describe who happened to be approved this week at each location; the case mix differs across centers, so these figures are not a verdict on any center's underlying pace.

Figure 2
The center comparison spotlight shows SRC's dominant share of approvals alongside WAC's much longer median, with transferred-case shares shown for each center.
This week's center-level medians and transferred-case share, week of 2026-09-07.
No status uptick detected.
Source: MyCasesHub case-status updates. 2026-09-07. n = 3,820.
For subscribers

Preview

Unlock the full analysis for your case

See the complete outlook, a personalised lookup against this week's cohort, and your estimated approval window.

  • Full premium analysis: outlook, what it means for you, and implications.
  • Personalised case lookup against this week's cohort, with percentile and remaining days.
  • Estimated approval window mapped to your filing date.
See plans from $5.99/mo

Cancel anytime. Plans from $5.99/month.

About this brief

Approval Trends Brief is a weekly data report from the MyCasesHub Data Team. It uses live USCIS case status updates from millions of cases tracked through MyCasesHub. Briefs are issued every Monday and revised whenever a material trend change is detected.

Methodology and resources

  • Source: USCIS case status updates collected through MyCasesHub user activity.
  • Approval marker: first occurrence of approval, card produced, or oath ceremony status.
  • Total wait (headline figure when at least 100 approvals that week, and at least half of them, have a known filing date): days from the date USCIS received the case to that marker. When the received date is not shown, it is estimated from neighbouring receipt numbers.
  • Final-stage wait (trend charts): days from a case's last status update before approval to that marker. It is shorter than the total wait.
  • All waits are measured on approved cases. USCIS's published processing time counts the time within which 80% of a category's cases were completed, so it is not the same statistic.
  • Outlier rule: final-stage waits above 1,095 days and total waits above 3,650 days are excluded.
  • Sample size threshold: cohorts with fewer than 100 cases are flagged as low confidence.
  • How we compute these numbers·I-539 only