Approval Trends Brief
Issue 35Published Aug 24, 2026
Family Petition · Week 35
I-130 · Family petition

I-130 Waits Run 35% Below Last Year, but an Upward Drift and Center Gap Complicate the Picture

The week of August 24 shows a 51-day final-stage median, well below the 79 days recorded a year ago. A widening 8-week slope and a 287-day gap between the two active processing centers add important context to an otherwise favorable reading.

I-130 final-stage waits have fallen to 51 days this week, down from 79 days in the same week last year, a 35.2% year-over-year improvement across 4,237 approved cases. That improvement is real, but two signals qualify it. The 8-week slope stands at +1.7 days per week, meaning the trend has been drifting upward even as the year-over-year comparison remains favorable. And the uneven_centers anomaly fired this week with a 287-day gap between the two active centers: IOE at 50 days across 4,217 cases, and the National Benefits Center (MSC) at 337 days across just 20. Applicants tracking their I-130 should read the 51-day headline as an IOE story, not a system-wide one.

Key findings
  1. The final-stage median for I-130 this week is 51 days, down from 79 days in the same week last year, a 35.2% year-over-year decline across 4,237 approved cases.
  2. The 8-week slope is +1.7 days per week (R² = 0.50), a directionally real upward drift even as the year-over-year comparison remains favorable.
  3. The uneven_centers anomaly fired with a 287-day gap: IOE processed 4,217 cases at a 50-day median; MSC processed 20 cases at a 337-day median.
  4. Cases that completed an RFE (Request for Evidence) response cleared in 19 days, versus 47 days for plain-processing cases, the rfe_fast anomaly firing this week at a 2.54x speed ratio.
  5. The total active I-130 backlog of pending cases grew by 26,492 cases (+3.8%) in the 28 days ending August 31, a structural pressure consistent with the upward drift in weekly medians.
01 / I-130 · Week 35, 2026

35% faster than a year ago — with an asterisk

35% faster YoY
The final-stage median this week is 51 days, down from 79 days in the same week last year.Same week last year: 79 days (n = 6,709). This week: 51 days (n = 4,237).

The median final-stage wait for I-130 approvals this week is 51 days, compared with 79 days recorded in the same week one year ago. That 28-day improvement, a 35.2% year-over-year decline, is the headline. The asterisk follows immediately: the two active processing centers this week are separated by 287 days. IOE, which handled 4,217 of this week's 4,237 approved cases, posted a median of 50 days. The National Benefits Center (MSC) handled the remaining 20 cases at a median of 337 days. That gap triggered the uneven_centers anomaly flag. MSC's sample is thin enough that its figure should be read as a rough indicator for applicants with MSC-prefix cases, not as a stable center-level estimate.

Zooming out to the full 12-week window, medians have ranged from 25 days (the week of June 29) to 76 days (the week of June 15), so this week's 51-day reading sits in the upper half of that range. The stretch has been volatile: the series moved from 67 days in early June down to 25 days by late June, then back up to 55 days the prior week before settling at 51 days. The year-over-year comparisons have been favorable throughout the recent weeks, with this week's same-week-last-year figure of 79 days well above the current level.

Figure 1
The 12-week median trend shows I-130 final-stage waits oscillating between 25 and 76 days, with this week's 51-day reading sitting below the same week last year at 79 days.
Median days from last reported status to approval, with the p25 to p75 band.
120120100100808060604040202000DaysJun 8Jun 8Jun 15Jun 15Jun 22Jun 22Jun 29Jun 29Jul 6Jul 6Jul 13Jul 13Jul 20Jul 20Jul 27Jul 27Aug 3Aug 3Aug 10Aug 10Aug 17Aug 17Aug 24Aug 24Forecast
p25 to p75
Weekly median
Forecast
Last year
Source: MyCasesHub case-status updates. 2026-06-08 to 2026-08-24. n = 4,237 (this week).
02 / Service centers

One center, 287 days behind the rest

IOE · Electronic
50days median
p25 33 d / p75 74 d / n = 4,217
MSC · Natl Benefits Center
337days median
n = 20 (thin sample)

IOE accounts for 4,217 of this week's 4,237 approved cases, or about 99.5% of the total. MSC accounts for 20. At that volume, MSC's 337-day median reflects a small group of cases routed through the National Benefits Center, likely adjustment-of-status pre-processing transfers, rather than a center-wide processing condition. The uneven_centers anomaly value of 144.28 is mathematically driven by this gap; it is a signal about case-mix routing, not evidence of a processing breakdown. The 8-week slope at IOE is +1.7 days per week (R² = 0.50); MSC's slope is +18.2 days per week (R² = 0.52), though the sample is too thin across the 12-week window to treat that slope as reliable. Applicants whose receipt number begins with MSC should be aware that this week's figure is an imprecise estimate based on a small sample, not a benchmark comparison against IOE's much larger volume.

Figure 2
The per-center breakdown makes the volume imbalance between IOE and MSC visible: IOE dominates at roughly 99.5% of approved cases this week, with a 50-day median, while MSC's 20-case reading sits at 337 days.
Median days per service center with 8-week slope; case counts differ substantially between centers.
45 d190 dIOEIOEMSCMSC200200150150100100505000Median days
Source: MyCasesHub case-status updates. Week of 2026-08-24. n = 4,237 total.
03 / Trend watch

A slow drift upward in the 8-week trend

Beneath the favorable year-over-year headline, the 8-week slope is +1.7 days per week, above the editorial threshold of ±0.5 days per week that separates directional movement from noise. If that pace continued for another eight weeks, the median would add roughly 14 days from the current level. The R² of 0.50 on the 8-week fit is a moderate result: the direction is upward, but week-to-week readings have been noisy. The series moved from 31 days in the week of June 22 to 43 days in the week of July 6, then to 47 days in late July, and then back and forth around 44 to 55 days through August. Reading any single week as confirmation of the trend overstates what the fit supports.

The 8-week drift is pointed in one direction, but the week-to-week noise makes it a signal to watch rather than a settled trajectory.
For subscribers

Preview

Unlock the full analysis for your case

See the complete outlook, a personalised lookup against this week's cohort, and your estimated approval window.

  • Full premium analysis: outlook, what it means for you, and implications.
  • Personalised case lookup against this week's cohort, with percentile and remaining days.
  • Estimated approval window mapped to your filing date.
See plans from $5.99/mo

Cancel anytime. Plans from $5.99/month.

About this brief

Approval Trends Brief is a weekly data report from the MyCasesHub Data Team. It uses live USCIS case status updates from millions of cases tracked through MyCasesHub. Briefs are issued every Monday and revised whenever a material trend change is detected.

Methodology and resources

  • Source: USCIS case status updates collected through MyCasesHub user activity.
  • Approval marker: first occurrence of approval, card produced, or oath ceremony status.
  • Days to approval: time from a case's last non-approval status update to that marker.
  • Outlier rule: cases with a measured wait above 1,095 days are excluded.
  • Sample size threshold: cohorts with fewer than 100 cases are flagged as low confidence.
  • How we compute these numbers·I-130 only